Two-Story.
I will tell you about the mistake before you find it. That's the whole arrangement.
Talk to Aaronor call (972) 528-5668
Making the footprint work
Size is usually decided by the lot, the setbacks and the budget, in that order. The plan has to answer all three.

The trades who do this work have been with me for years. I don’t put a job out to the lowest bidder and hope. The cheapest framer is expensive twice.
Mechanical, electrical and plumbing get coordinated before anyone cuts anything. Where the ducts run, whether the trusses can carry them, where the panel sits and how far the longest plumbing run has to travel. Done early, on paper, it costs a few meetings. Done in the field by whoever shows up first, it produces drilled structural members, soffits nobody planned for, and rooms that are colder than the rest of the house for reasons no one can trace.

I keep the number of concurrent builds low on purpose. Being on the job is the entire value of hiring a builder rather than a broker.
Change orders aren’t inherently bad. They are how a house adapts to what you learn while standing in it. What is bad is a change order you find out about after the work is done, or one priced as a favor and settled at the end. Mine are written before the work happens, with the cost and the schedule impact stated, and you sign them or you don’t. That’s it. It keeps the conversation about the house rather than about the invoice.
You'll get the bad news early, when it's still cheap to deal with.
I have watched the alternative, and I’m not interested in it.
You’ll see the house at every stage, and I want you on site during framing especially. That’s the window where changes are still cheap and still possible.

Site work is the single most underestimated line in a custom build. Clearing, cut and fill, the driveway, drainage structures, the septic field if you’re on one, and the utility runs from wherever the service actually is to wherever your house will be. On an easy lot it’s modest. On a hard one it can rival the cost of framing the entire house. I put real numbers on it before you’re committed, because discovering it later is the most common way a budget comes apart in the first ninety days.
Energy performance is mostly decided in the walls, not the equipment. Insulation that’s actually installed to its rated value rather than stuffed around wiring, an air barrier that’s continuous instead of theoretical, windows specified for the elevation they sit on, and ductwork inside conditioned space where it belongs. I run thermal scans on my jobs because a camera finds a gap that a walk-through never will. A house built tight and ventilated correctly is quieter, more comfortable in August, and cheaper to run for as long as it stands.
Slope is the difference between a slab and a much larger number. A lot that falls three feet across the building pad can mean retaining, extra fill, a stepped foundation or a walk-out basement that turns out to be the best room in the house. Which of those you get is a design decision, and it is cheaper to make it before the plans are done.

1The lot
First visit is boots on the dirt. I want to see where water goes in a hard rain, which trees are worth keeping and how a truck gets to the back of the property.

2The plan
Design happens against the real site, not a generic rectangle. You see the envelope, the constraints and the honest cost of the choices that are hard to reverse.

3The numbers
A real budget separates what the dirt costs from what the house costs. Most surprises in this business are site surprises, so that line gets honest numbers first.

4The dirt
Clearing, cut and fill, drainage structures and the slab. Nothing here shows up in a photograph and all of it determines how the house ages.

5The frame
Structure goes up and the house becomes real. This is when I want you on site often, because changes are still possible and still cheap.

6The finish
Cabinets, stone, tile, trim. Slower than people expect, because this is the part you touch every day for the next thirty years.

7The keys
We walk it together, write down what isn't right, and I fix it. Then I'm still reachable through the first year while the house settles.
Owners are on my sites regularly. The framing window is the one I push people to attend, because seeing the volume changes decisions.
From my jobs






Every home with photography has its own page in the portfolio.
Underneath the finishes
Framing, foundation and thermal work from real jobs. If a builder won’t show you this, ask why.






Related work and where I do it
Questions I get asked
What does two-story involve?
Size is usually decided by the lot, the setbacks and the budget, in that order. The plan has to answer all three. On my jobs that means a site walk before plans are final, honest site-cost numbers early, and a framing stage you’re invited to walk with me.
How do you price it?
Site work, foundation, framing and finishes get priced as separate realities so you can see where the money actually goes. I don’t bury the unglamorous line items.
Can I change things during the build?
Yes, and the cost of doing so climbs steeply after framing. That’s why I want you on site early, when a change is a conversation rather than demolition.
Who does the actual work?
Trades I have worked with for years. I don’t rebid every job to the lowest number, because the savings come back as callbacks.
Do you work outside Garland?
Across 6 counties in the DFW area. I take jobs I can get to often enough to actually be on them.
What if something goes wrong?
You hear it from me first, with the plan to fix it in the same conversation.
Talk to me about two-story
Bring me the lot or bring me the plans. Either is a place to start, and a first conversation costs nothing.