(972) 528-5668
Home
Services Services Homes Custom Home ConstructionLuxury Custom HomesHigh-End HomesNew ConstructionEstate Homes Styles ModernContemporaryTraditionalFarmhouseRanch-StyleMediterraneanEuropean-StyleIndustrial-Style Scale Large HomesSmall HomesSingle-StoryTwo-StoryMulti-Story Design Architectural DesignDesign ConsultationFloor PlansExterior StylesInteriorsLuxury FinishesTailored SpacesProject Management
Areas Service Areas Dallas County GarlandDallasRowlettSachseRichardsonMesquiteBalch SpringsSunnyvaleAddisonCarrolltonFarmers BranchIrvingHutchinsLancasterDeSotoDuncanvilleCockrell HillCedar HillGrand Prairie Collin County PlanoAllenWylieMurphyLucasLavonPrincetonMcKinneyFriscoThe ColonyLittle ElmProsperCelinaBlue RidgeFarmersville Rockwall County RockwallHeathFateRoyse CityMcLendon-ChisholmMobile City Kaufman County ForneyTerrellKaufmanCrandallTaltyCombineKemp Hunt County GreenvilleCaddo MillsQuinlanJosephine Ellis County Red OakGlenn Heights
Portfolio
About About Aaron Awards and Press Memberships and Partners
Blog Contact Member Dallas BATABGoogleFacebookInstagram Call (972) 528-5668
Skip to content
Aerial view of a custom home site from above, with the finishes in in Ridge Lakes of Heath

Multi-Story.

Wood, stone and steel all start imperfect. The job is refining them, not pretending otherwise.

Talk to Aaronor call (972) 528-5668

Making the footprint work

Size is usually decided by the lot, the setbacks and the budget, in that order. The plan has to answer all three.

Interior of a custom home from the doorway on the Shepherd’s Glen remodel
Shepherd’s Glen remodel

Nothing gets covered that I wouldn’t be comfortable looking at in five years. If something needs to be redone, it gets redone before the drywall goes on.

Selections are where schedules quietly die. Cabinets, tile, stone, plumbing fixtures and lighting all carry lead times, and a single backordered item can idle a crew for weeks. I front-load those decisions and keep a running list of what has been ordered, what has arrived and what’s still open. It’s unglamorous project management and it’s most of the difference between a build that lands near its date and one that drifts by a season. You’ll always know where yours stands, because I’d rather tell you early than explain later.

Exterior of a custom home from the driveway on an exterior remodel
Exterior remodel

The trades who do this work have been with me for years. I don’t put a job out to the lowest bidder and hope. The cheapest framer is expensive twice.

Energy performance is mostly decided in the walls, not the equipment. Insulation that’s actually installed to its rated value rather than stuffed around wiring, an air barrier that’s continuous instead of theoretical, windows specified for the elevation they sit on, and ductwork inside conditioned space where it belongs. I run thermal scans on my jobs because a camera finds a gap that a walk-through never will. A house built tight and ventilated correctly is quieter, more comfortable in August, and cheaper to run for as long as it stands.

Nothing gets covered up that I wouldn't want to look at myself in five years.

It costs a little more attention up front and saves a great deal later.

Nothing gets covered that I wouldn’t be comfortable looking at in five years. If something needs to be redone, it gets redone before the drywall goes on.

Interior of a custom home toward the adjoining room, mid-build at Fairways of Heath Crossing
Fairways of Heath Crossing

Selections are where schedules quietly die. Cabinets, tile, stone, plumbing fixtures and lighting all carry lead times, and a single backordered item can idle a crew for weeks. I front-load those decisions and keep a running list of what has been ordered, what has arrived and what’s still open. It’s unglamorous project management and it’s most of the difference between a build that lands near its date and one that drifts by a season. You’ll always know where yours stands, because I’d rather tell you early than explain later.

The foundation is the part of your house you’ll never look at and never stop depending on. In this part of Texas the soil is heavy clay that swells when it rains and shrinks when it doesn’t, which means the slab is designed for movement rather than pretending movement won’t happen. That means real engineering, correct moisture conditioning before the pour, post-tension cable laid where the drawings say and not where it’s convenient, and drainage that carries water away from the perimeter for the life of the house. Skipping any of it saves money in month three and costs a great deal in year eight.

Neighborhood review adds weeks that do not show up on any construction schedule. Some committees meet monthly and some meet when they feel like it, and until they sign off you are not pulling a permit. I ask about that in the first conversation because it decides when we can realistically break ground.

How the build runs

Seven phases. Two of them are invisible in photographs and both decide the house.

  1. Aerial view of a custom home site looking down the drive, under work lights on a job site

    1The lot

    First visit is boots on the dirt. I want to see where water goes in a hard rain, which trees are worth keeping and how a truck gets to the back of the property.

  2. Exterior of a custom home from the street at Craig Ranch, McKinney

    2The plan

    Drawings get made against the survey and the setbacks, so the house that comes back is one that can actually be permitted and built on your land.

  3. Aerial view of a custom home site from above, mid-build on a job site

    3The numbers

    Site work, foundation, framing and finishes get priced as separate realities. You see where the money actually goes, including the parts nobody enjoys paying for.

  4. Foundation and site work across the pad, in daylight during foundation work

    4The dirt

    Earthwork and foundation. This is the phase where doing it properly costs a little more and skipping it costs a great deal in year eight.

  5. Foundation and site work with rebar placed, with the finishes in during foundation work

    5The frame

    The skeleton goes up and suddenly the plan is a building. It's also the last cheap moment to move a window or raise a ceiling.

  6. Kitchen with light oak cabinetry, a veined quartz backsplash, a gas range and a long dark island at Fairways of Heath Crossing

    6The finish

    Cabinets, stone, tile, trim. Slower than people expect, because this is the part you touch every day for the next thirty years.

  7. Aerial view of the front of a white modern home with a dark standing seam roof and a stepping-stone walk at Fairways of Heath Crossing

    7The keys

    We walk it together, write down what isn't right, and I fix it. Then I'm still reachable through the first year while the house settles.

I will tell you when each phase starts. If you only walk the job once, walk it when the frame is up and the walls are still open.

From my jobs

Interior of a custom home looking toward the windows, in daylight at the Good Shepherds Cottage
Good Shepherds Cottage
Interior of a custom home along the main run, mid-build on the Shepherd’s Glen remodel
Shepherd’s Glen remodel
Wall of tall white cabinets with under-cabinet lighting and a quartz counter beside the kitchen island at Fairways of Heath Crossing
Fairways of Heath Crossing
Exterior of a custom home along the side elevation, with the space empty in Ridge Lakes of Heath
Ridge Lakes of Heath
Interior of a custom home toward the adjoining room, with the finishes in on the Mesquite remodel
Mesquite remodel
Interior of a custom home from the doorway, mid-build at Wimberly Place, Allen
Wimberly Place, Allen

Every home with photography has its own page in the portfolio.

Underneath the finishes

Framing, foundation and thermal work from real jobs. If a builder won’t show you this, ask why.

Thermal imaging scan during inspection at a ceiling joint, mid-build during a thermal inspection
Thermal inspection
Moisture and leak diagnostic work showing water staining, from a second position during leak diagnostics
Diagnostics
Aerial view of a custom home site looking down the drive, mid-build in Ridge Lakes of Heath
Ridge Lakes of Heath
Foundation and site work at the perimeter, in daylight during foundation work
Site work
Aerial view of a custom home site across the lot, with the space empty on a job site
On site
Thermal imaging scan during inspection over a duct run, mid-build during a thermal inspection
Thermal inspection

Related work and where I do it

ScaleLarge HomesLarge Custom Home BuilderSmall HomesSmall Custom Home BuilderSingle-StorySingle-Story Home BuilderTwo-StoryTwo-Story Home Builder
AreasRockwallRockwall CountyHeathRockwall CountyGarlandDallas CountyMcKinneyCollin CountyForneyKaufman CountyPlanoCollin County

Questions I get asked

What does multi-story involve?

Size is usually decided by the lot, the setbacks and the budget, in that order. The plan has to answer all three. On my jobs that means a site walk before plans are final, honest site-cost numbers early, and a framing stage you’re invited to walk with me.

How do you price it?

Site work, foundation, framing and finishes get priced as separate realities so you can see where the money actually goes. I don’t bury the unglamorous line items.

Can I change things during the build?

Yes, and the cost of doing so climbs steeply after framing. That’s why I want you on site early, when a change is a conversation rather than demolition.

Who does the actual work?

Trades I have worked with for years. I don’t rebid every job to the lowest number, because the savings come back as callbacks.

Do you work outside Garland?

Across 6 counties in the DFW area. I take jobs I can get to often enough to actually be on them.

What if something goes wrong?

You hear it from me first, with the plan to fix it in the same conversation.

Front elevation of a two-story white stucco home with an arched iron entry door, cast stone trim and a steep slate-gray roof at Craig Ranch, McKinney

Talk to me about multi-story

Bring me the lot or bring me the plans. Either is a place to start, and a first conversation costs nothing.

Start the conversation(972) 528-5668

Every home I build is a mark left on this world.
Something that will outlast me.

Talk to Aaron
Member of the Dallas Builders Association and the Texas Association of Builders Dallas BATABGoogleFacebookInstagram
© 2026 Aaron Jordan Custom Homes. Building since 2014. Services Areas Portfolio Awards Partners Contact