Farmersville’s custom home builder.
Lots where soil, drainage and orientation decide the foundation before anything else.
Talk to Aaronor call (972) 528-5668
Building a house in Farmersville
What makes a Farmersville build work is decided early, usually before the plans are finished.

I walk the lot before I price anything. Where the pad sits, how the drive comes in, which trees stay. Those calls are cheap on paper and expensive once concrete is down.
Weather is the variable nobody controls. A wet spring can cost weeks on dirt work before the pad is even ready, and there’s no version of the job where you pour a foundation into saturated ground and get away with it. I build float into the schedule for exactly this, and when it runs out I tell you rather than quietly compressing the finish phase to protect a date. A house rushed through trim and paint shows it for the next thirty years.

You’re going to live with the decisions made in the first sixty days for as long as you own the house. That’s where I spend my attention.
The walk-through isn’t the end. There’s a punch list, and then there’s the first year, when a new house dries out and settles and reveals the things that only appear under real use. Nail pops, a door that needs adjusting, a grout line that wants attention. I expect those calls and I answer them. A builder who disappears at closing was never really building for you; he was building to hand something over.
I'd rather have an uncomfortable conversation in week six than an angry one at the walk-through.
That’s the standard, and it doesn’t move depending on the size of the job.
Wood, stone and steel all start imperfect. The job is refining them, not pretending otherwise.

Mechanical, electrical and plumbing get coordinated before anyone cuts anything. Where the ducts run, whether the trusses can carry them, where the panel sits and how far the longest plumbing run has to travel. Done early, on paper, it costs a few meetings. Done in the field by whoever shows up first, it produces drilled structural members, soffits nobody planned for, and rooms that are colder than the rest of the house for reasons no one can trace.
The foundation is the part of your house you’ll never look at and never stop depending on. In this part of Texas the soil is heavy clay that swells when it rains and shrinks when it doesn’t, which means the slab is designed for movement rather than pretending movement won’t happen. That means real engineering, correct moisture conditioning before the pour, post-tension cable laid where the drawings say and not where it’s convenient, and drainage that carries water away from the perimeter for the life of the house. Skipping any of it saves money in month three and costs a great deal in year eight.
Access decides your framing schedule. If a concrete truck and a lumber delivery cannot both get in, the job runs at half speed and the trades stop taking your calls. On a tight infill lot that means staging deliveries; on acreage it means building a drive that can carry a loaded truck before anything else happens.
Work from around here






Each of these homes has its own gallery in the portfolio.
Farmersville and the rest of Collin County

1The lot
First visit is boots on the dirt. I want to see where water goes in a hard rain, which trees are worth keeping and how a truck gets to the back of the property.

2The plan
Drawings get made against the survey and the setbacks, so the house that comes back is one that can actually be permitted and built on your land.

3The numbers
You get a breakdown you can actually read, with the unglamorous items priced rather than buried in an allowance nobody explains.

4The dirt
Earthwork and foundation. This is the phase where doing it properly costs a little more and skipping it costs a great deal in year eight.

5The frame
Structure goes up and the house becomes real. This is when I want you on site often, because changes are still possible and still cheap.

6The finish
Cabinets, stone, tile, trim. Slower than people expect, because this is the part you touch every day for the next thirty years.

7The keys
We walk it together, write down what isn't right, and I fix it. Then I'm still reachable through the first year while the house settles.
Drop in any time. During framing I'd rather you came twice, because a change then is a conversation instead of a demolition bill.
What the site tells you
Dirt, drainage and structure from real jobs. The unglamorous phase that decides the house.






Questions I get asked
Do you build in Farmersville?
I do. Farmersville is close enough that I'm not planning a day around the drive, which is the only reason I take work anywhere.
What is different about building in Farmersville?
Lots where soil, drainage and orientation decide the foundation before anything else. That shapes the foundation and the footprint before anything else.
Do I need a lot first?
Not at all. Some of my best builds started with a conversation about which lot to buy rather than what to put on it.
How long will it take?
The site decides more of the schedule than the house does. Difficult dirt, long utility runs or HOA review all add time, and I will tell you which apply to your lot.
Do you handle the permits?
Yes. Each jurisdiction here runs a little differently and I deal with all of it.
What happens if something goes wrong?
You hear it from me first, and you hear the fix in the same conversation.
Thinking about a build in Farmersville?
There's no pressure on a first call about a Farmersville home. Ask what you want to ask.