
Farmers Branch’s custom home builder.
Lots where soil, drainage and orientation decide the foundation before anything else.
Talk to Aaronor call (972) 528-5668
Building a house in Farmers Branch
Farmers Branch is close enough to home that I’m on site, not managing it from a truck two counties away.

I’d rather spend an extra two weeks in planning than an extra two months in the field. That trade has never once gone the other way.
The walk-through isn’t the end. There’s a punch list, and then there’s the first year, when a new house dries out and settles and reveals the things that only appear under real use. Nail pops, a door that needs adjusting, a grout line that wants attention. I expect those calls and I answer them. A builder who disappears at closing was never really building for you; he was building to hand something over.

Utilities, access and grade are the three things that quietly set your calendar. I’d rather tell you in week one that the drive is going to be a project than surprise you in month four.
Energy performance is mostly decided in the walls, not the equipment. Insulation that’s actually installed to its rated value rather than stuffed around wiring, an air barrier that’s continuous instead of theoretical, windows specified for the elevation they sit on, and ductwork inside conditioned space where it belongs. I run thermal scans on my jobs because a camera finds a gap that a walk-through never will. A house built tight and ventilated correctly is quieter, more comfortable in August, and cheaper to run for as long as it stands.
If something goes wrong, you hear it from me first, and you hear the plan to fix it in the same conversation.
That’s the part you’re paying a builder for, whatever the plans look like.
I put my family name on the sign. That’s most of what keeps the standard where it is.

Roof geometry does more work than almost any other decision. It sets the massing you see from the street, the volume you feel inside, where water goes, how much attic you have and what your framing costs. A complicated roof photographs beautifully and introduces valleys, which are where roofs leak. I’m not against complexity, but every plane should be there for a reason you can name. The simplest roof that gives you the rooms you want is almost always the one that ages best.
Weather is the variable nobody controls. A wet spring can cost weeks on dirt work before the pad is even ready, and there’s no version of the job where you pour a foundation into saturated ground and get away with it. I build float into the schedule for exactly this, and when it runs out I tell you rather than quietly compressing the finish phase to protect a date. A house rushed through trim and paint shows it for the next thirty years.
Neighborhood review adds weeks that do not show up on any construction schedule. Some committees meet monthly and some meet when they feel like it, and until they sign off you are not pulling a permit. I ask about that in the first conversation because it decides when we can realistically break ground.
Work from around here






Each of these homes has its own gallery in the portfolio.
Farmers Branch and the rest of Dallas County

1The lot
We walk it together. Grade, drainage, trees, access, where the sun comes from. I tell you what the site will and won't allow before anyone draws a plan.

2The plan
This is where we decide the things that can't be undone later: where the house sits, which way it faces and how the rooms stack.

3The numbers
A real budget separates what the dirt costs from what the house costs. Most surprises in this business are site surprises, so that line gets honest numbers first.

4The dirt
Clearing, cut and fill, drainage structures and the slab. Nothing here shows up in a photograph and all of it determines how the house ages.

5The frame
The skeleton goes up and suddenly the plan is a building. It's also the last cheap moment to move a window or raise a ceiling.

6The finish
Everything you'll actually put your hands on. It moves slowly on purpose, because rushed trim work shows for as long as the house stands.

7The keys
Walk-through, punch list, and a builder who still answers the phone afterward. One family has now brought me back for a fourth project. That only happens if the last one went right.
Come by whenever you like. The frame stage is the one worth planning a visit around, because it's the last point where moving something is cheap.
What the site tells you
Dirt, drainage and structure from real jobs. The unglamorous phase that decides the house.






Questions I get asked
Do you build in Farmers Branch?
I build across Dallas County, Farmers Branch included. If I couldn't get there regularly I would tell you rather than take it.
What is different about building in Farmers Branch?
Lots where soil, drainage and orientation decide the foundation before anything else. That shapes the foundation and the footprint before anything else.
Do I need a lot first?
No, and it's often better if you haven't. A bad lot is the most expensive thing you can bring to a builder.
How long will it take?
Selections, site work and review decide most of it. I will give you a real range once we have walked your lot.
Do you handle the permits?
Yes, along with any HOA architectural review, which is often the longest lead item.
What happens if something goes wrong?
You get the call from me rather than discovering it at the walk-through. That's the whole arrangement.
Thinking about a build in Farmers Branch?
Talk to me before the Farmers Branch plans are final. It's cheaper to change a drawing.
