Design Consultation.
Every job has something go sideways. The difference is whether you find out from the builder or from an inspector.
Talk to Aaronor call (972) 528-5668
The work around the build
Most of what determines whether a build goes well happens on paper, or in a conversation, long before a truck shows up.

The trades who do this work have been with me for years. I don’t put a job out to the lowest bidder and hope. The cheapest framer is expensive twice.
Energy performance is mostly decided in the walls, not the equipment. Insulation that’s actually installed to its rated value rather than stuffed around wiring, an air barrier that’s continuous instead of theoretical, windows specified for the elevation they sit on, and ductwork inside conditioned space where it belongs. I run thermal scans on my jobs because a camera finds a gap that a walk-through never will. A house built tight and ventilated correctly is quieter, more comfortable in August, and cheaper to run for as long as it stands.

I price the site work honestly, including the parts nobody enjoys paying for. Dirt, drainage, drives and utilities are where the surprises live, and I’d rather put real numbers on them in month one.
Roof geometry does more work than almost any other decision. It sets the massing you see from the street, the volume you feel inside, where water goes, how much attic you have and what your framing costs. A complicated roof photographs beautifully and introduces valleys, which are where roofs leak. I’m not against complexity, but every plane should be there for a reason you can name. The simplest roof that gives you the rooms you want is almost always the one that ages best.
You'll get the bad news early, when it's still cheap to deal with.
It’s ordinary discipline, applied consistently, which turns out to be rare.
I keep the number of concurrent builds low on purpose. Being on the job is the entire value of hiring a builder rather than a broker.

Energy performance is mostly decided in the walls, not the equipment. Insulation that’s actually installed to its rated value rather than stuffed around wiring, an air barrier that’s continuous instead of theoretical, windows specified for the elevation they sit on, and ductwork inside conditioned space where it belongs. I run thermal scans on my jobs because a camera finds a gap that a walk-through never will. A house built tight and ventilated correctly is quieter, more comfortable in August, and cheaper to run for as long as it stands.
Most of what people think of as builder quality is really trade quality. The framer who keeps walls plumb, the plumber who thinks about access before he thinks about speed, the finish carpenter who cares what a return looks like from four feet away. I don’t rebid those relationships every job to shave a percentage point. The trades on my sites have been with me for years, they know the standard I’m going to hold them to, and they know I will pay them fairly to meet it. That isn’t sentiment. It’s the only reliable way I know to make good work repeatable.
Existing structures complicate everything. A teardown means demolition, disconnects, and finding out what is actually under the old slab, which is never what the survey said. Budget the unknown honestly or the first month eats the contingency you were saving for finishes.

1The lot
Before anything is drawn I want to stand on the lot with you and talk about what it's actually going to cost to build here, starting with the dirt.

2The plan
This is where we decide the things that can't be undone later: where the house sits, which way it faces and how the rooms stack.

3The numbers
You get a breakdown you can actually read, with the unglamorous items priced rather than buried in an allowance nobody explains.

4The dirt
Clearing, cut and fill, drainage structures and the slab. Nothing here shows up in a photograph and all of it determines how the house ages.

5The frame
Walls, roof and the shape of every room. Come walk it while it's open; standing in a space teaches more than any elevation drawing.

6The finish
Millwork, surfaces and paint. The phase that takes the longest per square foot and the one people remember when they walk in.

7The keys
We walk it together, write down what isn't right, and I fix it. Then I'm still reachable through the first year while the house settles.
You're welcome on site at any phase. During framing I actively want you there, because that's the window where a change is still a conversation rather than demolition.
From my jobs






Every home with photography has its own page in the portfolio.
Underneath the finishes
Framing, foundation and thermal work from real jobs. If a builder won’t show you this, ask why.






Related work and where I do it
Questions I get asked
What does design consultation involve?
Most of what determines whether a build goes well happens on paper, or in a conversation, long before a truck shows up. On my jobs that means a site walk before plans are final, honest site-cost numbers early, and a framing stage you’re invited to walk with me.
How do you price it?
Site work, foundation, framing and finishes get priced as separate realities so you can see where the money actually goes. I don’t bury the unglamorous line items.
Can I change things during the build?
Yes, and the cost of doing so climbs steeply after framing. That’s why I want you on site early, when a change is a conversation rather than demolition.
Who does the actual work?
Trades I have worked with for years. I don’t rebid every job to the lowest number, because the savings come back as callbacks.
Do you work outside Garland?
Across 6 counties in the DFW area. I take jobs I can get to often enough to actually be on them.
What if something goes wrong?
You hear it from me first, with the plan to fix it in the same conversation.
Talk to me about design consultation
Bring me the lot or bring me the plans. Either is a place to start, and a first conversation costs nothing.