Building a house in Celina
If you’re building in Celina, the lot is already telling you what the house wants to be.

I walk the lot before I price anything. Where the pad sits, how the drive comes in, which trees stay. Those calls are cheap on paper and expensive once concrete is down.
A custom home is a long relationship with whoever builds it. You’ll talk to me more in eighteen months than you talk to most people in your life, and a good portion of those conversations will be about things that didn’t go to plan. That’s normal. Weather moves, materials arrive damaged, an inspector reads something differently than expected. What matters is whether the person telling you has a plan attached to the news, and whether the same person is still answering the phone a year after you move in. One family has brought me back for a fourth project. That only happens if the earlier ones went right.

Utilities, access and grade are the three things that quietly set your calendar. I’d rather tell you in week one that the drive is going to be a project than surprise you in month four.
Mechanical, electrical and plumbing get coordinated before anyone cuts anything. Where the ducts run, whether the trusses can carry them, where the panel sits and how far the longest plumbing run has to travel. Done early, on paper, it costs a few meetings. Done in the field by whoever shows up first, it produces drilled structural members, soffits nobody planned for, and rooms that are colder than the rest of the house for reasons no one can trace.
Nothing gets covered up that I wouldn't want to look at myself in five years.
It costs a little more attention up front and saves a great deal later.
Wood, stone and steel all start imperfect. The job is refining them, not pretending otherwise.

Change orders aren’t inherently bad. They are how a house adapts to what you learn while standing in it. What is bad is a change order you find out about after the work is done, or one priced as a favor and settled at the end. Mine are written before the work happens, with the cost and the schedule impact stated, and you sign them or you don’t. That’s it. It keeps the conversation about the house rather than about the invoice.
Energy performance is mostly decided in the walls, not the equipment. Insulation that’s actually installed to its rated value rather than stuffed around wiring, an air barrier that’s continuous instead of theoretical, windows specified for the elevation they sit on, and ductwork inside conditioned space where it belongs. I run thermal scans on my jobs because a camera finds a gap that a walk-through never will. A house built tight and ventilated correctly is quieter, more comfortable in August, and cheaper to run for as long as it stands.
Permitting here is its own small project. Plan review, the engineered foundation letter, the drainage plan, and on an acreage lot the septic permit, which has its own soil testing and its own calendar. I start those early because none of them move faster for being asked twice, and a set of plans sitting in review is a set of plans not being built.
Work from around here






Each of these homes has its own gallery in the portfolio.
Celina and the rest of Collin County

1The lot
We walk it together. Grade, drainage, trees, access, where the sun comes from. I tell you what the site will and won't allow before anyone draws a plan.

2The plan
Drawings get made against the survey and the setbacks, so the house that comes back is one that can actually be permitted and built on your land.

3The numbers
You get a breakdown you can actually read, with the unglamorous items priced rather than buried in an allowance nobody explains.

4The dirt
Clearing, cut and fill, drainage structures and the slab. Nothing here shows up in a photograph and all of it determines how the house ages.

5The frame
Structure goes up and the house becomes real. This is when I want you on site often, because changes are still possible and still cheap.

6The finish
Millwork, surfaces and paint. The phase that takes the longest per square foot and the one people remember when they walk in.

7The keys
We walk it together, write down what isn't right, and I fix it. Then I'm still reachable through the first year while the house settles.
Drop in any time. During framing I'd rather you came twice, because a change then is a conversation instead of a demolition bill.
What the site tells you
Dirt, drainage and structure from real jobs. The unglamorous phase that decides the house.






Questions I get asked
Do you build in Celina?
Yes. Celina sits in Collin County, and it's inside the area I can get to often enough to actually be on the job.
What is different about building in Celina?
Open farmland turning residential, where utilities are the long pole. That shapes the foundation and the footprint before anything else.
Do I need a lot first?
You don't. Bring me the ones you're considering and I will tell you what each would cost you in dirt before you commit.
How long will it take?
It depends on the house and the site. Tell me about yours and I will give you a real range rather than a brochure number.
Do you handle the permits?
That’s mine to handle, permits and review both.
What happens if something goes wrong?
I tell you before you find it, along with what I intend to do about it and what it changes.