Services Services Homes Custom Home ConstructionLuxury Custom HomesHigh-End HomesNew ConstructionEstate Homes Styles ModernContemporaryTraditionalFarmhouseRanch-StyleMediterraneanEuropean-StyleIndustrial-Style Scale Large HomesSmall HomesSingle-StoryTwo-StoryMulti-Story Design Architectural DesignDesign ConsultationFloor PlansExterior StylesInteriorsLuxury FinishesTailored SpacesProject Management
Areas Service Areas Dallas County GarlandDallasRowlettSachseRichardsonMesquiteBalch SpringsSunnyvaleAddisonCarrolltonFarmers BranchIrvingHutchinsLancasterDeSotoDuncanvilleCockrell HillCedar HillGrand Prairie Collin County PlanoAllenWylieMurphyLucasLavonPrincetonMcKinneyFriscoThe ColonyLittle ElmProsperCelinaBlue RidgeFarmersville Rockwall County RockwallHeathFateRoyse CityMcLendon-ChisholmMobile City Kaufman County ForneyTerrellKaufmanCrandallTaltyCombineKemp Hunt County GreenvilleCaddo MillsQuinlanJosephine Ellis County Red OakGlenn Heights
Portfolio
About About Aaron Awards and Press Memberships and Partners
Blog Contact Member Dallas BATABGoogleFacebookInstagram Call (972) 528-5668
Skip to content
Front of a two-story stucco home with an arched wood entry door, tall steep roofs and a brick paver walk at Wimberly Place, Allen

Terrell’s custom home builder.

Older in-town lots and surrounding farmland with generous frontage.

Talk to Aaronor call (972) 528-5668

Building a house in Terrell

A house in Terrell gets designed around the lot it sits on, not dropped onto it.

Kitchen with light oak cabinetry, a veined quartz backsplash, a gas range and a long dark island at Fairways of Heath Crossing
Fairways of Heath Crossing

The plan has to answer the site. A footprint that works on a flat acre doesn’t work on a walk-out grade, and forcing it produces a house that fights its own lot forever.

Selections are where schedules quietly die. Cabinets, tile, stone, plumbing fixtures and lighting all carry lead times, and a single backordered item can idle a crew for weeks. I front-load those decisions and keep a running list of what has been ordered, what has arrived and what’s still open. It’s unglamorous project management and it’s most of the difference between a build that lands near its date and one that drifts by a season. You’ll always know where yours stands, because I’d rather tell you early than explain later.

Exterior of a custom home from the street, in daylight in Ridge Lakes of Heath
Ridge Lakes of Heath

Every house here deals with heat, wind and clay. Handling those well isn’t a feature. It’s the baseline, and it’s mostly invisible when it’s done right.

Mechanical, electrical and plumbing get coordinated before anyone cuts anything. Where the ducts run, whether the trusses can carry them, where the panel sits and how far the longest plumbing run has to travel. Done early, on paper, it costs a few meetings. Done in the field by whoever shows up first, it produces drilled structural members, soffits nobody planned for, and rooms that are colder than the rest of the house for reasons no one can trace.

Every job has something go sideways. The difference is whether you find out from the builder or from an inspector.

I’d rather over-explain this early than have you learn it the hard way.

The trades on my jobs have worked with me for years. That isn’t sentiment, it’s how the work stays good.

Interior of a custom home along the main run on the Mesquite remodel
Mesquite remodel

Roof geometry does more work than almost any other decision. It sets the massing you see from the street, the volume you feel inside, where water goes, how much attic you have and what your framing costs. A complicated roof photographs beautifully and introduces valleys, which are where roofs leak. I’m not against complexity, but every plane should be there for a reason you can name. The simplest roof that gives you the rooms you want is almost always the one that ages best.

The foundation is the part of your house you’ll never look at and never stop depending on. In this part of Texas the soil is heavy clay that swells when it rains and shrinks when it doesn’t, which means the slab is designed for movement rather than pretending movement won’t happen. That means real engineering, correct moisture conditioning before the pour, post-tension cable laid where the drawings say and not where it’s convenient, and drainage that carries water away from the perimeter for the life of the house. Skipping any of it saves money in month three and costs a great deal in year eight.

Access decides your framing schedule. If a concrete truck and a lumber delivery cannot both get in, the job runs at half speed and the trades stop taking your calls. On a tight infill lot that means staging deliveries; on acreage it means building a drive that can carry a loaded truck before anything else happens.

Work from around here

Interior of a custom home toward the ceiling detail, in daylight at The Providence, Heath
The Providence, Heath
Overhead drone view of foundation trenches dug in the dirt, tracing the outline of the house before the pour
On site
Interior of a custom home looking toward the windows, from a second position at Shepherd’s Glen
Shepherd’s Glen
Exterior of a custom home from the street at the Good Shepherds Cottage
Good Shepherds Cottage
Interior of a custom home from the doorway, mid-build on the Shepherd’s Glen remodel
Shepherd’s Glen remodel
Interior of a custom home toward the ceiling detail at Fairways of Heath Crossing
Fairways of Heath Crossing

Each of these homes has its own gallery in the portfolio.

Terrell and the rest of Kaufman County

What I buildCustom Home Constructionground-up on your lotLuxury Custom Homeswhen the finish level is the pointHigh-End Homesheavier specification throughoutNew Constructionstarting from raw dirtEstate Homesacreage and a longer programModernflat planes, steel and glass
Near TerrellForneyexpanding acreage east of Dallas withKaufmanlots where soil, drainage and orientationCrandalllots where soil, drainage and orientationTaltylots where soil, drainage and orientationCombinelots where soil, drainage and orientationKemplots where soil, drainage and orientation

How the build runs

Seven phases. The dirt and the frame are where a build is won or lost.

  1. Aerial view of a custom home site from above, with the space empty on a job site

    1The lot

    First visit is boots on the dirt. I want to see where water goes in a hard rain, which trees are worth keeping and how a truck gets to the back of the property.

  2. Front elevation of a two-story white stucco home with an arched iron entry door, cast stone trim and a steep slate-gray roof at Craig Ranch, McKinney

    2The plan

    Drawings get made against the survey and the setbacks, so the house that comes back is one that can actually be permitted and built on your land.

  3. Aerial view of a custom home site from above, with the trim set on a job site

    3The numbers

    A real budget separates what the dirt costs from what the house costs. Most surprises in this business are site surprises, so that line gets honest numbers first.

  4. Foundation and site work with rebar placed, with the finishes in during foundation work

    4The dirt

    Pad, drainage and foundation. The least photogenic phase and the one that decides whether the house is still square in twenty years.

  5. Foundation and site work before the pour, with the finishes in during foundation work

    5The frame

    The skeleton goes up and suddenly the plan is a building. It's also the last cheap moment to move a window or raise a ceiling.

  6. Interior of a custom home looking toward the windows at the Good Shepherds Cottage

    6The finish

    Everything you'll actually put your hands on. It moves slowly on purpose, because rushed trim work shows for as long as the house stands.

  7. Exterior of a custom home at dusk at Wimberly Place, Allen

    7The keys

    We walk it together, write down what isn't right, and I fix it. Then I'm still reachable through the first year while the house settles.

Drop in any time. During framing I'd rather you came twice, because a change then is a conversation instead of a demolition bill.

What the site tells you

Dirt, drainage and structure from real jobs. The unglamorous phase that decides the house.

Moisture and leak diagnostic work at the affected subfloor, later in the build during leak diagnostics
Diagnostics
Aerial view of a custom home site from the north side, after completion in Ridge Lakes of Heath
Ridge Lakes of Heath
Foundation and site work at the footing line, in daylight during foundation work
Site work
Aerial view of a custom home site across the lot, from a second position on a job site
On site
Thermal imaging scan during inspection at a ceiling joint during a thermal inspection
Thermal inspection
Moisture and leak diagnostic work at the leak source, in daylight, seen again from another position during leak diagnostics
Diagnostics

Questions I get asked

Do you build in Terrell?

I build across Kaufman County, Terrell included. If I couldn't get there regularly I would tell you rather than take it.

What is different about building in Terrell?

Older in-town lots and surrounding farmland with generous frontage. That shapes the foundation and the footprint before anything else.

Do I need a lot first?

No, and it's often better if you haven't. A bad lot is the most expensive thing you can bring to a builder.

How long will it take?

Selections, site work and review decide most of it. I will give you a real range once we have walked your lot.

Do you handle the permits?

Yes, along with any HOA architectural review, which is often the longest lead item.

What happens if something goes wrong?

You get the call from me rather than discovering it at the walk-through. That's the whole arrangement.

Exterior of a custom home from the driveway at the Good Shepherds Cottage

Thinking about a build in Terrell?

Bring me the Terrell plans, or bring me the lot. Either is a place to start.

Start the conversation(972) 528-5668

Every home I build is a mark left on this world.
Something that will outlast me.