Estate Homes.
You'll get the bad news early, when it's still cheap to deal with.
Talk to Aaronor call (972) 528-5668
What this actually involves
A ground-up build is a sequence of irreversible decisions. The ones that matter most happen before the slab.

I price the site work honestly, including the parts nobody enjoys paying for. Dirt, drainage, drives and utilities are where the surprises live, and I’d rather put real numbers on them in month one.
A custom home is a long relationship with whoever builds it. You’ll talk to me more in eighteen months than you talk to most people in your life, and a good portion of those conversations will be about things that didn’t go to plan. That’s normal. Weather moves, materials arrive damaged, an inspector reads something differently than expected. What matters is whether the person telling you has a plan attached to the news, and whether the same person is still answering the phone a year after you move in. One family has brought me back for a fourth project. That only happens if the earlier ones went right.

Nothing gets covered that I wouldn’t be comfortable looking at in five years. If something needs to be redone, it gets redone before the drywall goes on.
Site work is the single most underestimated line in a custom build. Clearing, cut and fill, the driveway, drainage structures, the septic field if you’re on one, and the utility runs from wherever the service actually is to wherever your house will be. On an easy lot it’s modest. On a hard one it can rival the cost of framing the entire house. I put real numbers on it before you’re committed, because discovering it later is the most common way a budget comes apart in the first ninety days.
The trades on my jobs have worked with me for years. That isn't sentiment, it's how the work stays good.
I’d rather over-explain this early than have you learn it the hard way.
I price the site work honestly, including the parts nobody enjoys paying for. Dirt, drainage, drives and utilities are where the surprises live, and I’d rather put real numbers on them in month one.

A custom home is a long relationship with whoever builds it. You’ll talk to me more in eighteen months than you talk to most people in your life, and a good portion of those conversations will be about things that didn’t go to plan. That’s normal. Weather moves, materials arrive damaged, an inspector reads something differently than expected. What matters is whether the person telling you has a plan attached to the news, and whether the same person is still answering the phone a year after you move in. One family has brought me back for a fourth project. That only happens if the earlier ones went right.
The walk-through isn’t the end. There’s a punch list, and then there’s the first year, when a new house dries out and settles and reveals the things that only appear under real use. Nail pops, a door that needs adjusting, a grout line that wants attention. I expect those calls and I answer them. A builder who disappears at closing was never really building for you; he was building to hand something over.
Permitting here is its own small project. Plan review, the engineered foundation letter, the drainage plan, and on an acreage lot the septic permit, which has its own soil testing and its own calendar. I start those early because none of them move faster for being asked twice, and a set of plans sitting in review is a set of plans not being built.

1The lot
We walk it together. Grade, drainage, trees, access, where the sun comes from. I tell you what the site will and won't allow before anyone draws a plan.

2The plan
This is where we decide the things that can't be undone later: where the house sits, which way it faces and how the rooms stack.

3The numbers
Site work, foundation, framing and finishes get priced as separate realities. You see where the money actually goes, including the parts nobody enjoys paying for.

4The dirt
Earthwork and foundation. This is the phase where doing it properly costs a little more and skipping it costs a great deal in year eight.

5The frame
The skeleton goes up and suddenly the plan is a building. It's also the last cheap moment to move a window or raise a ceiling.

6The finish
Millwork, surfaces and paint. The phase that takes the longest per square foot and the one people remember when they walk in.

7The keys
Handover, punch list and the first-year calls that come after. A builder who disappears at closing was never really building for you.
You're welcome on site at any phase. During framing I actively want you there, because that's the window where a change is still a conversation rather than demolition.
From my jobs






Every home with photography has its own page in the portfolio.
Underneath the finishes
Framing, foundation and thermal work from real jobs. If a builder won’t show you this, ask why.






Related work and where I do it
Questions I get asked
What does estate homes involve?
A ground-up build is a sequence of irreversible decisions. The ones that matter most happen before the slab. On my jobs that means a site walk before plans are final, honest site-cost numbers early, and a framing stage you’re invited to walk with me.
How do you price it?
Site work, foundation, framing and finishes get priced as separate realities so you can see where the money actually goes. I don’t bury the unglamorous line items.
Can I change things during the build?
Yes, and the cost of doing so climbs steeply after framing. That’s why I want you on site early, when a change is a conversation rather than demolition.
Who does the actual work?
Trades I have worked with for years. I don’t rebid every job to the lowest number, because the savings come back as callbacks.
Do you work outside Garland?
Across 6 counties in the DFW area. I take jobs I can get to often enough to actually be on them.
What if something goes wrong?
You hear it from me first, with the plan to fix it in the same conversation.
Talk to me about estate homes
Bring me the lot or bring me the plans. Either is a place to start, and a first conversation costs nothing.